The waste authority for Redbridge is East London Waste Authority. Back in 2015 East London Waste Authority recycled 24.1% of its waste, landfilled 28.4%, and incinerated 26.2%.
By 2023 incineration had increased by 14.6 percentage points to 40.8%.
Recycling increased over the same period by 3.7 percentage points to 27.7%. In 2023 0% of waste was landfilled.
There are currently 3 years left on a contract with Renewi. The total contract value is £1390.69m.
Notes:
The interactive table below shows how waste has been dealt with in authorities in the region between 2014/15 and 2022/23.