Back in 2015 Northumberland recycled 40.8% of its waste, landfilled 5.2%, and incinerated 54.1%.
By 2023 incineration had increased by 3 percentage points to 57.1%.
Recycling decreased over the same period by 7.8 percentage points to 33.1%. In 2023 9.8% of waste was landfilled.
There are currently 1 years left on a contract with Suez. The total contract value is £682m. The contract has a clawback arrangement: “NCC can gain a percentage of the value of energy sold onto the market above an agreed base case set at the beginning of the contract. There is no guarantee year to year that NCC will receive an income.”
Notes:
The interactive table below shows how waste has been dealt with in authorities in the region between 2014/15 and 2022/23.