Recycling has decreased 0.1 percentage points in the waste authority for East Renfrewshire

Strictly embargoed 0:00 GMT, Tuesday, 15 October 2024

Back in 2014 East Renfrewshire recycled 56.1% of its waste, landfilled 43.1%, and incinerated 0.7%.

By 2022 incineration had increased by 33.8 percentage points to 34.5%.

Recycling decreased over the same period by 0.1 percentage points to 56%. In 2022 7.9% of waste was landfilled.

The waste authority for East Renfrewshire is The Clyde Valley Project. There are currently 21 years left on a contract with Viridor. The total contract value is £700m.

Notes:

  1. Figures do not always add up to 100% as there is a fourth ‘other’ category.
  2. In some cases figures total over 100% as it may include waste from the previous year.
  3. Rounding may also lead to some percentage changes being slightly higher or lower than the difference between the two figures: in this situation please check the full spreadsheet for more detailed figures.
  4. Some annual returns in Scotland are incomplete comparing 2014 and 2022. This is because, at some authorities, data on incineration was not collected back in 2014. Other authorities have also not submitted an annual return for 2022 in the Scottish Environmental Protection Agency (SEPA) data.