Back in 2015 Gateshead MBC recycled 35.1% of its waste, landfilled 5.6%, and incinerated 59.2%.
By 2023 incineration had increased by 6.2 percentage points to 65.4%.
Recycling decreased over the same period by 3.7 percentage points to 31.4%. In 2023 1.2% of waste was landfilled.
The waste authority for Gateshead is South Tyne and Wear Waste Management Partnership. There are currently 15 years left on a contract with Suez. The total contract value is £717.51m. The contract has a clawback arrangement: “There is a sharing agreement linked to income from energy if it rises above an agreed limit, but the specific details of this arrangement are confidential.”
Notes:
The interactive table below shows how waste has been dealt with in authorities in the region between 2014/15 and 2022/23.