Back in 2015 Anglesey recycled 55.2% of its waste, landfilled 43.2%, and incinerated 0%.
By 2023 incineration had increased by 34.4 percentage points to 34.4%.
Recycling increased over the same period by 8.3 percentage points to 63.5%. In 2023 1.9% of waste was landfilled.
The waste authority for Isle of Anglesey is North Wales Waste Partnership. There are currently 20 years left on a contract with Enfinium. The total contract value is £600m. The contract has a clawback arrangement: “Yes, there are income sharing arrangements with the Councils once total income from Parc Adfer breaches certain values specified in the contract (gain sharing thresholds).”
Notes:
The interactive table below shows how waste has been dealt with in authorities in the region between 2014/15 and 2022/23.